Playgrounds & sheds · Boerne, Texas 26833 I-10, Boerne, TX 78006Open today: 10 AM–6 PMCall or text (830) 743-9418

Plan your shed

Shed permits in Unincorporated Bexar County, TX

Local permit guidance, application preparation and official sources for your storage shed project.

Sources reviewed November 14, 2026

Do I need a permit for a shed in Unincorporated Bexar County?

For a shed outside city limits in Bexar County, ask Public Works and the Fire Marshal to determine the approvals required for the address and proposed use. The county assigns building-permit determinations for structures outside single-family dwelling use to the Fire Marshal. Confirm how your detached residential storage shed is classified.

Start with Bexar County Public Works and Fire Marshal.

Local application and placement details

  • Bexar County lists floodplain, stormwater, right-of-way and septic approvals separately. Its permit guidance calls for construction review for floodplain impacts. Include the shed, foundation and any driveway changes when discussing the project.
  • Scenic Oaks, Cross Mountain, Timberwood Park and Alamo Ranch area addresses should be checked individually for city limits and any applicable ETJ requirements. Public Works is available at 210-335-6700 and the Fire Marshal at 210-335-0300. HOA and deed restrictions also need property-specific review.

Official sources Bexar County building permit jurisdiction and verification · Bexar County permit categories

Confirm the authority for your address

Use your full street address and parcel information to confirm city limits, county jurisdiction and any applicable extraterritorial jurisdiction (ETJ) requirements. ZIP codes and mailing-city names can cover multiple jurisdictions. Ask the city or county to identify the approvals that apply to your specific property.

This guide is linked from our service areas for Alamo Ranch, Scenic Oaks, Cross Mountain, Timberwood Park. Verify the jurisdiction of each address before applying these rules.

For a property outside city limits, ask the county about development, floodplain, septic and access approvals. Confirm HOA or property-owner association restrictions with the association or architectural-review committee.

What to prepare for a shed permit inquiry

Use this planning checklist when contacting your permitting office. Have staff confirm the required documents and drawings for your project.

  1. Property information. Gather the street address, parcel identification and a survey or recorded plat showing property lines and easements.
  2. Shed dimensions and use. Provide width, length, floor area and overall height. Explain whether the shed is site-built or delivered, and describe storage, workshop or other intended uses.
  3. A proposed site plan. Mark the shed location, distances to property lines and other buildings, access, easements and existing improvements. Include septic tanks and drain fields when present.
  4. Construction and foundation information. Identify the foundation or support system, anchoring and any concrete work. Ask whether framing drawings, engineered plans or foundation details are required.
  5. Utilities and site changes. Disclose electrical, plumbing, HVAC, exterior lighting, excavation, grading and drainage changes so staff can identify separate approvals.
  6. Private approvals and inspections. Check deed restrictions and HOA or architectural-review requirements. Confirm who submits applications, pays fees and schedules each required inspection before work starts.

Common shed planning questions

Does a small shed still need HOA approval?

Check your recorded restrictions and association rules for shed size, appearance, height and placement, then obtain any required written approval before ordering. Include the shed drawings and proposed location in your architectural-review request.

What about a 10 × 12 or 12 × 16 shed?

A 10 × 12 footprint is 120 square feet and a 12 × 16 footprint is 192 square feet. Ask your permitting authority how it measures floor area and treats roof overhangs, porches and attached features. Confirm the size threshold along with the foundation, utilities and intended use.

Can I add electricity or air conditioning later?

Before adding systems, ask the permitting office about electrical, mechanical and other trade permits, contractor requirements and inspections. Describe future plans during the initial shed inquiry so you can account for the drawings and approvals needed.

Can I use a shed as an office or living space?

Tell the permitting office about the intended occupied use before choosing a design. Ask how zoning, building classification, energy requirements, utilities and any septic capacity affect the project. Obtain approval for the use you actually plan.

How much will the permit cost, and how long will it take?

Request the current fee schedule and review timeline from the local office after it confirms the project category. Include foundation, trade and other required approvals in your estimate, and allow for plan corrections and inspections when scheduling construction.

Choose a shed for your property

Explore our custom-built sheds and discuss the dimensions, options and site access for your project. Confirm local approvals before construction is scheduled.